Presentation/Discussion
– Red Rock Corridor Update – Lyssa Leitner (Washington County and project
manager for Red Rock) provides a little history on the Red Rock Corridor and its
original idea of using the existing rail track for commuter rail. She notes that the idea has changed and
explains the move over to Bus Rapid Transit (BRT), what that is and how it
works. She notes that BRT would operate in
addition to the current express bus routes but would be more convenient for
more people than the current bus service, providing all-day service in both
directions along the line. She discusses
the possible stops and how the system and implementation would work. There are two alternatives being considered for alignment. One of these would connect with 3 additional stops on the east side - at Etna, Earl and Mound Blvd.
At this point Ms. Leitner asks for questions – Will the BRT
leave Hwy 61 for the stops.? Yes.
She moves her talk to the Lower Afton Site. The site is difficult to expand with Indian
Burial Mounds to the immediate south and park/wetlands to the north. She asks for questions.
Comment from attendees that scaling back Gateway and Red Rock from LRT to
BRT has cascading effects on economic development and that St. Paul is getting
the short end of the mass transit investment dollars versus Hennepin County
which will see long term development benefits.
L. Leitner talks about the cost effectiveness numbers of rail in our
current funding systems. That funding
system makes LRT unworkable from the funding perspective under the current
environment – there are too few projected riders for the cost that would be
involved with light rail.
What is the difference in cost between LRT and BRT? Gateway Rail was $1 Billion, 2 Lanes of BRT
was $500 million. The Red Rock Proposal
is about $45 million.
Is there an immediate solution to the pedestrian problem at
the Lower Afton park and ride? There are
no immediate plans but better signage or markings might help. Metro Transit knows that it is a problem and
she recommends that more people notify Metro Transit to see about enticing them
to do something. She will also mention
it to their staff at her next meeting with them. (NOTE: this contact has been
made and Metro Transit is looking into options.)
P. Sawyer asks the D1 board members to stand for a moment so
that attendees will know who is on the board.
He then brings up County Commissioner Jim McDonough.
Boys Totem Town –
J. McDonough provides an overview/history of the Boys Totem Town issue and
needs. He introduces several folks that
are with him tonight from Ramsey and Hennepin County: John Klavins (head of Corrections), Keith
Lattimer (head of Boys Totem Town) and Chris Crutchfield (Corrections
Communication officer), Angela Cousins (Hennepin County project manager), Keith
Allen (Ramsey County project manager).
J. McDonough believes that we will get to a joint Hennepin/Ramsey site
at a new location. We still have 3 to 4
years before the site would be vacated. He believes that “unless there is a
real hiccup, we’ll be leaving (the current) site.”
He reiterates that Ramsey County will work with the city and the
community to determine what to do with the current site when it is vacated.
Sheldon Johnson reiterates Commissioner McDonough’s comments
on involving the neighborhood. B. Leach
also announces that D1 will be working with interested neighbors going
forward.
Several different ideas are espoused as to what should/could
happen at the site.
Which school district will be chosen to provide services/how
will that work at relocated facility?
Usually the partnership is with the school district where the facility
is located.
There are some concluding comments and P. Sawyer thanks
everyone for attending and adjourns the meeting at 8:16 pm.